On this page
What is production management software and a bill of materials?
It is the software that defines what goes into every product you make and then runs it: it issues materials from stock, records working time and adds finished goods to stock at their true cost. A bill of materials (BOM) is the product’s recipe: its components, their quantities and the expected scrap on each.
In Anzma it is the manufacturing module, and it builds on products, warehouses and accounting, so there is no second stock list and no second ledger. The material an order consumes leaves the same warehouse you buy into, and finished goods enter the same warehouse you sell from. Sales sees what was produced and the accountant sees what it cost.
The module belongs to Anzma’s operations management software line and suits any business that makes its own products, even a small one. It is honestly an MRP-lite: built for a small or mid-sized factory that wants accurate bills, true cost and a sensible material plan, not for heavy advanced scheduling.
How do you build a multi-level bill of materials?
You build a bill for a finished product by stating the output quantity it covers and then adding components: catalogue products with a quantity, a unit and a scrap percentage. If a component has a bill of its own it becomes a sub-assembly and is exploded further during planning and execution, with no fixed depth limit. The system rejects cycles, so a product can never contain itself, even two levels down.
You then add what makes costing accurate: operations on work centres with setup and run time, overhead in three ways (a fixed amount per batch, per unit, or a percentage of material value), and by-products that come out of production. A product can have several versions of its bill, only one active for new orders, so you can change a recipe without touching running orders.
The example below is illustrative, with made-up numbers: a wooden desk made of a top (a sub-assembly with its own bill), bought legs, screws and paint. The table shows how the unit cost builds up from the bottom.
| Item | Quantity | Cost |
|---|---|---|
| Desk top (sub-assembly): board 2 m² plus 5% scrap | 2.1 m² | 630 |
| Desk top: edge banding 6 m | 6 m | 30 |
| Bought legs | 4 | 200 |
| Screws and paint | 16 + 0.5 litre | 48 |
| Labour: 90 minutes at 60 per hour | 90 min | 90 |
| Overhead per unit | 1 | 22 |
| Cost of one finished desk | 1,020 |
How does a production order move from draft to finished goods?
A production order goes through four stages: draft, confirmed, in progress and done, and it can be cancelled before it finishes. When you create it you choose the product, quantity, raw-material warehouse and finished-goods warehouse, and the system explodes the active bill into material lines you can edit.
- 1
Create the order
Pick the product, quantity and planned dates. Quantities come from the bill multiplied by the order quantity plus scrap, and the bill’s operations and overhead are copied to the order.
- 2
Confirm and check shortages
On confirmation the system lists material shortages. If you switched on blocking on shortage the order cannot be confirmed until materials are available; otherwise it confirms with the list shown.
- 3
Issue materials
Issue materials from the raw-material warehouse, all or part, and reverse a line if it was a mistake. For batch or serial items you pick the batch; otherwise the oldest stock goes first.
- 4
Log time
Record actual minutes against each operation, with the employee if you want. Labour cost uses the work-centre rate or the employee’s rate, depending on a setting.
- 5
Receive finished goods
Receive the good output into the finished-goods warehouse, in one receipt or several, and log actual scrap and by-products. The last receipt takes everything consumed, so the order costs exactly what it used.
- 6
Complete
On completion whatever is left in work in progress, such as an under-yield, moves to production variance, so no balance stays hanging on a finished order.
How is the cost of a manufactured product calculated?
The cost of a manufactured product is the materials actually issued, plus the cost of work-centre time and overhead, divided by the good quantity produced. It is built on what was really issued, not on the theoretical standard, so if scrap runs high the unit cost rises and shows it.
That cost enters stock at its exact value, so the finished product’s average cost moves with the new batch and the sales margin report uses it. If a batch costs more than the previous one the average rises in proportion to its weight, not in a sudden jump.
Overhead is applied in three ways: an amount per batch (scaled by order quantity over bill quantity), an amount per unit, and a percentage of material value. Each line is rounded to the currency’s decimals, so tiny fractions never pile up between stock and the ledger.
How do I compare standard and actual cost on a production order?
On confirmation the system freezes the standard cost computed from the bill: materials, time and overhead. After execution the actual cost accumulates from issues and the time log, so you compare the two on the order and in reports and see whether the gap comes from material price, scrap quantity or working time.
The example is illustrative, with made-up numbers: an order for 10 desks from the bill above, standard 10,200. Wood scrap ran higher than expected and working time was 10% over. The table shows how to read the difference.
| Item | Standard | Actual | Gap |
|---|---|---|---|
| Materials | 9,080 | 9,420 | +340 |
| Labour | 900 | 990 | +90 |
| Overhead | 220 | 220 | 0 |
| Total | 10,200 | 10,630 | +430 |
| Unit cost | 1,020 | 1,063 | +43 |
Which accounting entries does manufacturing post?
The module posts automatic entries to accounting through three mapping accounts: work in progress, absorbed production overhead and production variance. A company created earlier gets them the first time they are needed, so no manual set-up is required before you start. If an order is cancelled, all its entries are reversed.
| Step | Stock effect | Accounting entry |
|---|---|---|
| Issue materials | Raw-material stock falls | Debit work in progress, credit inventory |
| Working time | None | Debit work in progress, credit absorbed overhead |
| Overhead | None | Debit work in progress, credit absorbed overhead |
| Receive finished goods | Finished stock rises | Debit inventory, credit work in progress |
| Complete the order | None | Remainder goes to production variance |
How do work centres and capacity load work?
A work centre is a machine, line or department with daily hours of capacity and an hourly cost that combines labour and machine. You attach bill operations to it, so you know how many minutes each product takes on cutting, assembly or packing, and time cost follows the centre’s rate.
The capacity-load screen shows the planned minutes on each centre day by day, spread over the working days between an order’s start and end and skipping weekends. You can see early that assembly is overloaded next week, and then move an order or add a shift.
To be exact, the load is a planned view, not an automatic scheduler that resolves clashes by itself. The decision stays with you and the system shows the picture in numbers.
- Set a centre’s daily capacity and hourly cost once.
- Setup time and run time are defined per unit in the bill.
- Actual time is logged on the order and compared with plan in reports.
- Hourly cost can come from the centre or from the employee who did the work.
What is MRP and does a small factory need it?
Material requirements planning works out what you must make or buy to cover demand without piling up stock or stopping for a missing material. A small factory needs it once products and materials outgrow memory, or when it makes to order and loses track of weekly shortages.
The module reads demand from draft invoices, open quotations and reorder levels of stocked items within a horizon you set in days, then subtracts stock on hand and what open production orders already supply. It explodes products from the top down, so a sub-assembly needed by two parents is planned once, and returns suggestions: make for products with a bill, buy for the rest.
From that list you pick what to accept and it creates draft production orders, plus draft purchase orders per supplier for missing materials. A material with no known supplier is reported, never guessed. You decide what is approved; the system never acts on its own.
Does it support sub-assemblies, batches and by-products?
Yes. A sub-assembly is an ordinary product with a bill, so it appears as a component in another bill and is made by its own order or planned inside the finished product’s order. By-products are defined in the bill and received with the good output into their own warehouse.
For food and similar industries the module works with batches and serial numbers: the order takes materials from chosen batches or oldest first, and the finished product is produced with a batch number taken from the order number and an expiry computed from the shelf life on the bill. Serial products get a number per unit produced. You can tell which material batch went into which product batch, which you need when recalling a lot.
Which manufacturing reports are available?
Five reports cover cost and usage: production cost by order and product, material usage against standard, scrap, work-centre utilisation and the work-in-progress balance, plus dashboard widgets for open orders. You can export them to analyse elsewhere.
Material usage is the most useful for a plant manager: it shows where you consume more than the bill says, and that is where scrap savings begin. The work-in-progress report tells the accountant the value of what was started and not finished at month end, so it enters the financial statements correctly.
How does a spreadsheet differ from an integrated production module?
A spreadsheet is enough for one product and two materials, then it starts to fail when material prices change or products multiply. The core difference is that the sheet knows neither stock nor ledger, so every order becomes a second and third entry and you lose trust in unit cost.
| Aspect | Spreadsheets | Manufacturing module |
|---|---|---|
| Materials | Deducted by hand from a stock file | Issued from the same stock, instantly |
| Material price | Updated by hand, ruins old costs | True average cost at the time of issue |
| Sub-assemblies | Tangled formulas | Nested bills exploded automatically |
| Actual cost | A rough estimate | Real issues, time and overhead |
| Accounting entry | Manual after production | Automatic at every step |
| Material shortage | Found during execution | Shortage list before confirmation |
What does the manufacturing module not do?
We would rather tell you up front what it does not cover. It does not schedule orders automatically on machines by capacity, it does not read machine data directly, and it has no dedicated barcode shop-floor screen for operators. What it gives you is a complete production cycle from bill to cost to entry, with data entered by a supervisor or storekeeper.
It is also not a separate quality-management or preventive-maintenance system. For repair shops and customer jobs the work orders module covers that, and fixed assets handles depreciation. If your plant needs something specific, raise it in the meeting and we will tell you honestly whether it is covered today.
Is manufacturing in every plan and what does it need?
Manufacturing is on the Comprehensive and Enterprise plans only, as part of the plan and not a paid add-on. It depends on products, warehouses and accounting, which are switched on with it. See the pricing and plans page to compare other limits such as users and branches.
Permissions are fine-grained: reading costs on a production order is separate from creating it, and approval has its own permission, so a shop-floor worker does not see margins. Order numbering, default warehouses and the planning horizon are module settings, and multiple warehouses and branches are supported within your plan limits.
Which factories and workshops is the module for?
It suits any business that turns materials into a product with a recipe: factories of all kinds, food factories that need batches and shelf life, bakeries where the recipe is the bill, garment factories with their stages, furniture workshops and metalworks. A central kitchen for a restaurant chain can use its recipes too.
If your business is a restaurant selling to guests directly, the restaurant module has its own recipes for dish costing. Manufacturing here is for batch production that is stored and sold later.
The cycle connects to the rest of the platform: raw material is bought through purchasing, enters stock, is issued to production, and finished goods leave through sales, so cost and margin appear together. See also the guide to choosing an ERP if you are comparing systems.
Frequently asked questions
What is a bill of materials (BOM)?
A bill of materials is a product’s recipe: its components, their quantities and the scrap on each, with operations, overhead and by-products. In Anzma a component can itself be a sub-assembly with its own bill, and a product can have several versions, only one active for new orders.
What is a production order?
A production order requests making a quantity of a product from its bill. It moves through draft, confirmed, in progress and done, issues materials from stock, logs working time, adds finished goods at actual cost, posts accounting entries automatically and reverses all of it when cancelled.
How is the cost of a manufactured product calculated?
It is the materials actually issued plus work-centre time and overhead, divided by the good quantity. The cost enters stock at its exact value so the finished product’s average cost moves with it, and any gap appears in the material usage report and the production variance account.
What is MRP and does a small factory need it?
MRP plans what to make and what to buy to cover demand. A small factory needs it when products and materials multiply. Anzma’s simple version reads draft invoices, open quotations and reorder levels and suggests draft production and purchase orders, without automatic machine scheduling.
Does it support sub-assemblies?
Yes. Any component with an active bill is treated as a sub-assembly and exploded down to raw materials, with no fixed depth limit and cycles rejected. It can be made by its own order or planned inside the finished product’s order, and scrap at each level multiplies the need below it.
How do I see work-centre load?
The load screen shows planned minutes per centre per day, spread over working days between the start and end of its orders and skipping weekends, against the centre’s daily capacity. It is a view for your decisions, not an automatic scheduler that reorders the work.
Is manufacturing available on the Basic plan?
No. Manufacturing is on the Comprehensive and Enterprise plans only and is not an add-on you buy separately. You can upgrade your plan to switch it on; see the pricing page or book an online meeting and we will help you pick the plan for your plant’s size.
Does it support batches and expiry dates?
Yes, once batches are enabled for the product. An order takes materials from chosen batches or oldest first, and the finished product is produced under a batch numbered after the order with an expiry from the shelf life on the bill, so you can trace a material batch to a product batch.
What happens if I cancel an order after issuing materials?
You can cancel with a reason. The stock movements and accounting entries the order created are reversed: issued materials return to their warehouse and work-in-progress entries are cancelled. No balance stays hanging, and the cancelled order keeps its history with the reason.
How do I start using manufacturing in my factory?
Register raw materials and finished goods in the catalogue with opening balances, then create bills for your best sellers and your work centres. Run one small order and compare its cost with your own figures. Book an online meeting and we will map these steps onto your business.
Does manufacturing connect to accounting?
Yes. Every step posts a double entry: materials, time and overhead to work in progress, finished goods to inventory, and any remainder on completion to production variance. Unfinished production therefore shows in your financial statements without manual journals.
Part of the product line
operations management software
What your company sells besides finished goods, from appointments to rented units, work orders and production, becomes an invoice and an entry automatically in one system.
Rate this page
Did you find this useful? Your rating helps others.
No ratings yet.